EVX Midstream:
South Texas (Eagle Ford Shale) Projects:
-
Patriot SWD Gathering System: Ditch and install 8 miles of 8” SDR11 Poly, and 7 miles of 6” SDR11 Poly. Including 10 well connects, 6 road bores, and 3 valve stations.
-
Patriot SWD J Hinds Extension: Ditch and install 3 miles of 6” SDR11 Poly. Including 1 well connect, and 1 valve station.
-
Patriot SWD Phase II Extension: Ditch and install 7.5 miles of 8” SDR11 Poly. Including 4 well connects, 1 road bore, and 2 valve stations.
-
Maverick Crude Gathering System: Ditch and install 12.7 miles of 6” .250 carbon steel pipe and 7.3 miles of 4" .250 carbon steel pipe. Including 8 well connects, 11 road bores, 10 pigging facilities, 4 valve stations, and 1 booster station.
-
Patriot SWD Gathering System Booster Station: Ditch and install Dual 8” SDR 11 poly pipe, for inlet and discharge lines for produced water booster station.