432-618-9960

3424 S county Rd 1192

Midland, TX 79706

info@jenningsenergy.net

  • Facebook

Jennings Energy Services

Patriot SWD Gathering System
Ditch and install

​  8 miles of 8” SDR11 Poly

  7 miles of 6” SDR11 Poly 

 

Including:

 10 well connects

  6 road bores

  3 valve stations

​  Dual 8” SDR11 Poly Pipe

For:

  Inlet and Discharge lines

  for produced water booster station

Patriot SWD System Booster Station
Ditch and install:

​  3 miles of 6” SDR11 Poly 

 

Including:

  1 well connects

  1 valve stations

Patriot SWD J Hinds Extension
Ditch and install:

PROJECTS